The three tree icon represents listings courtesy of NWMLS.
© 2026 All Rights Reserved
Great Value for Small C-3 zoned Lots.Subdivision has two Machine Shops scheduled for construction.Water, and Phase 3 power will be run throughout the project.Drainage and Strom Water treatment are designed into the park and will not be required of individual parcel owners.All storage will require screening, Steel buildings ok with false front facing road.The road will be heavy duty with 4 inches of Asphalt over an 18 inch engineered base.The park provides easy access to 260/I-17 and is a great hub for business with Prescott, Prescott Valley, Cottonwood, Clarkdale, Sedona, Jerome, and Strawberry, Pine and Payson.In addition it is the center of the state and the middle point between I-10 and I-40 on I-17...See More
* There are no open house dates scheduled at this time. Please reach out to the lister for an in person or virtual viewing.
